Commercial Projects
Rolling Keder Roof XL over Massey Uni Block
To enable roof repairs on Massey University Block 10 iScaff was asked to build a temporary roof which was 48m long with an 18m wide span. As an extra difficulty this roof was build on lower buildings with glass roofs. Only the access tower and storage platform of the scaffolding were built on the ground.
Lambton Quay façade scaffolding
For this scaffolding over a canopy with glass it was essential to drill steel anchors into the wall above the glass which acted as the scaffolding foundation. In addition, to avoid any major traffic management on Lambton Quay the scaffolding components were lowered down from the above car park.